Recommended Sponsor Painted-Moon.com - Buy Original Artwork Directly from the Artist

Source: New Zealand Transport Agency

|

Waka Kotahi NZ Transport Agency advises that road surfacing works will take place on State Highway 3 at the Awakino Tunnel Bypass from late October into December.

For the duration of the work, traffic will be reduced to one lane with Stop/Go control and a 30 km/hr speed limit. The rest area and walkway to the tunnel will be closed to the public while the surfacing is taking place. 

Drivers travelling between Taranaki and Waikato should expect delays and allow extra time for their journey. 

The surfacing work marks the final stage of the Awakino Tunnel Bypass project. The temporary speed limit will be removed once the work is complete. 

Waka Kotahi thanks drivers for their patience.

Tags

MIL OSI