SH25 resurfacing works at Thames and Kopu overnight tonight

0
6

Source: New Zealand Transport Agency

Waka Kotahi NZ Transport Agency advises overnight resurfacing works on State Highway 25 in Thames and Kopu will take place overnight tonight (Friday 26 February).

These works had been scheduled for overnight last Saturday (20 February) but were postponed.

Nightworks will be undertaken between MacKay Street and Grey Street in Thames and between Kopu Road and the entrance to Claymark in Kopu between 8pm and 5am. Stop/Go traffic management will be in place during these works with a temporary speed limit of 30km/h, then 50km/h until the line markings are reinstated.

It is important motorists adhere to the relevant temporary speed limits during these works to avoid damage to their vehicles and ensure their safety and that of other road users and road workers.

These works are part of the Waka Kotahi spring/summer road maintenance programme, which will see repairs and reseals on state highways across the Waikato to ensure the safety and resilience of the state highway network.

In the event of bad weather or other unforeseen circumstances, work may be postponed. Visit the interactive Waka Kotahi Journey Planner website for the latest information on roadworks, traffic, road closures and detours to help plan your trip.

Journey Planner(external link)

Waka Kotahi thanks motorists for their patience while we undertake these important works.

Plan ahead for a safe, enjoyable journey this summer. Keep up to date with:

MIL OSI

Previous articleThe transformation of downtown to continue with development opportunity
Next articleWaka Kotahi says no immediate plans for Auckland Harbour Bridge vehicle restrictions