Source: Statistics New Zealand
Ready-mixed concrete: March 2025 quarter – 12 May 2025 – Ready-mixed concrete statistics provide an indicator of construction activity.
Key facts
- In the March 2025 quarter, the actual volume of ready-mixed concrete produced was 854,509 cubic metres, down 1.5 percent compared with the March 2024 quarter.
- In the year ended March 2025, 3.8 million cubic metres of ready-mixed concrete was produced, down 5.4 percent compared with the year ended March 2024.
- In seasonally adjusted terms, the volume of ready-mixed concrete rose 1.4 percent in the March 2025 quarter, following a 4.6 percent fall in the December 2024 quarter.
Files: