Traffic lights at SH7 Ahaura River Bridge from Monday

0
3

Source: New Zealand Transport Agency

Waka Kotahi NZ Transport Agency is advising road users that starting next week (from Monday 19 October) due to construction work, temporary traffic lights will be operating at the SH7 Ahaura River Bridge.

All motorists, cyclists and pedestrians using the bridge are encouraged to prepare for potential delays of around five minutes. 

The temporary traffic lights will be located at the southern end of the bridge and are expected to be in place until the end of the year. 

Work being undertaken includes preparation of the new road alignment to the new bridge. 

Waka Kotahi thanks all road users for their patience during the SH7 Ahaura River Bridge Replacement Project. 

Once complete, the replacement bridge will improve travel times and road safety for all road users and increase the resilience and reliability of State Highway 7 – a key inland link from Westport to Greymouth. Additional improvements include a pedestrian path on the upstream side of the new bridge, a shoulder for cyclists, pedestrian crossing facilities in Ahaura township and improvements to the intersection of Camp Street and Clifton Street. 

For more information on the project please visit: www.nzta.govt.nz/projects/sh7-ahaura-river-bridge-replacement/(external link)

Plan ahead for a safe, enjoyable journey. Keep up to date with:

MIL OSI

Previous articleCentral Waikato summer maintenance programme begins near Tirau next week
Next articleTe Atatu marae takes another step forward